Loading...
About Image

Critical path method

• The critical path method (CPM) is an algorithmic project modeling and scheduling technique used to analyze a network of dependent project activities. It calculates the longest sequence of planned activities (the critical path) to logical end points, determining the shortest possible time to complete a project and identifying which activities have float or drag

4 hr

Created by Dr. YASSER MEKKY

EN/AR [Auto]

Join Now
# Content
1 • Introduction & History
2 • Basic Technique & Modeling
3 • Network Logic & Calculations
4 • Float and Slack Analysis
5 • Critical Path Drag & Cost Analysis
6 • Schedule Compression Techniques
7 • Expansions and Advanced Concepts
# Outcomes
• Ability to identify critical activities that directly impact the planned project completion date.
• Mastery in calculating float, slack, and critical path drag to attribute time delays and associated costs to individual tasks.
• Competence in tracking schedule variances, handling resource constraints through resource leveling, and managing changes between planned and as-built schedules.
# Participants
1
D
Designed for project managers, operations managers, industrial engineers, schedulers, and professionals across industries such as construction, aerospace, defense, software development, engineering, research, and plant maintenance.